Replacement Instrument Evaluations

1 followers
0 Likes

I know this has been asked before but what do you all do to evaluate replacements for broken instruments that are replaced by the vendor, i.e. iStats, Epocs? Do you do anything different for waived vs moderately complex instruments?


We are currently trying to balance the Regulations against the reality of cost and time. And we are CAP.


I  get so much good information from everyone on this listserve so I thank everyone in advance for their help.


Liz


P.S. Good luck on the exam! I wish I could join your study group just to hear what you are discussing. I am sure there will be a lot of great info

31 Replies

 I am currently using the I-STAT. What do you use to challenge the low and high end


reportable range for CO2?


I have read in the chain above  that hypoxic and hyperbaric cal ver is used for PO2. Is


 this from Eurotrol?


I am trying to validate the EG6+ cartridges.


Does anyone have an IQCP for these cartridges?


 


 


 

Displaying items 31-31 of 31 in total
Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Elizabeth Millen
about 6 years ago
31
Replies
0
Likes
1
Followers
6735
Views
Liked By:
Suggested Posts
TopicRepliesLikesViewsParticipantsLast Reply
iSTAT in NICU -chem 8, CG4
Kim Ballister
about 13 hours ago
40125
Kim Ballister
about 8 hours ago
Rotem Sigma Validation Help
BRENDA PENA
about 15 hours ago
1085
BRENDA PENA
about 9 hours ago
Hemochron Sig Elite use outside of manufacturer temperature range
Melisa Wagoner
2 days ago
10135
Melisa Wagoner
about 17 hours ago