COM.30450 IN POINT OF CARE TESTING
1 followers
0 Likes
Hello POCC's.
I am just curious as to how your facility satisfies COM.30450 for NEW REAGENT LOT/SHIPMENT CONFIRMATION OF ACCEPTABILITY.
Do you always run old lot again new lot all the time? In our facility, we run QC on all new lot/new shipment and check it against the previous results done on the old lot.
Any insight is appreciated. Thank you so much!
3 Replies
Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Suggested Posts
Topic | Replies | Likes | Views | Participants | Last Reply |
---|---|---|---|---|---|
iSTAT in NICU -chem 8, CG4 | 5 | 0 | 253 | ||
Rotem Sigma Validation Help | 1 | 0 | 102 | ||
Hemochron Sig Elite use outside of manufacturer temperature range | 2 | 0 | 170 |
Hello Donna,
We do the same thing as you but I have a QC sheet that I fill out with every new shipment with a table showing the old shipment/lot number with the new shipment/Lot = Lot number.
If you want to see my template more than willing to share it.
my email: joseph.rudic@tuhs.temple.edu
We test the new shipment against the current shipment for both epoc and Hemochron ACT. We have a template that will calculate everything out and have a procedure to follow. I can share templates as well. :)
deatone@bronsonhg.org
Joseph or Erika can you share your QC sheet with me also?
How do you document review of EQC and TQC?
slowery@firsthealth.org
Thank you, Sylvia