How to present a Self evaluation report during inspection

0 followers
0 Likes

I missed to submit my Infec. Mono. results to API and so a self evaluation will be my option. The report came out and my results were all acceptable. I'm pretty new with POC and still learning, just want to see how you do a self evaluation report when an inspector comes. Thank you.

Sent via Groupsite Mobile.

2 Replies

Your core lab should have a proficiency testing (PT) investigation form, used for a PT failure.  You can use the same form to document your self-evaluation. 


If you cannot find one, create one with the following info:


1. A table to include your results, the group's means from API and acceptable ranges


2. Document what occurred


3. Document how you will prevent it from reoccurring


4. Signatures of testing personnel or yours (in this case), supervisor, and lab director.


Attach your support documents to this form.

Thank you Don, this will help me a lot.

Sent via Groupsite Mobile.

Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Cezar Quiratmam
over 4 years ago
2
Replies
0
Likes
0
Followers
1097
Views
Liked By:
Suggested Posts
TopicRepliesLikesViewsParticipantsLast Reply
iSTAT in NICU -chem 8, CG4
Kim Ballister
3 days ago
50259
Kim Ballister
2 days ago
Rotem Sigma Validation Help
BRENDA PENA
3 days ago
10104
BRENDA PENA
3 days ago
Hemochron Sig Elite use outside of manufacturer temperature range
Melisa Wagoner
5 days ago
20172
Melisa Wagoner
2 days ago