Enter/Edit in Epic for POCT tests

8 followers
1 Likes

I am going through all our POCT tests and how they are entered into EPIC. It seems like we are all over the place and there is no standard. What do you have as fields under the Components?
Right now we have QC/Patient logs for all tests, None of our instruments are interfaced and we are not accredited.

1. Lot number
2. Exp. Date
3. Result
3. Internal Control (does not have right now)
4. Anything else I am forgetting.
Attachment.
image.png


2 Replies

Hi Anastasia,
There is no other component that we use that you didn't list.

One note on the 'internal control'.
I wasn't the contact with the builder when someone else added the 'internal control' as a component (originally when the POC Director and I did work with the builder, we had to resort to use a dot phrase for 'internal control' documentation).
My disappointment was that whomever did build in the 'internal control' component only considered 'the C line' in the component text; technically, that does not capture all the onboard/internal controls in waived testing (e.g. background clearing, if a reagent goes from one color to another color after addition of a 2nd reagent to the 1st reagent), electronic internal controls that shut down the instrument/reader if they do not 'pass'. 

Good job!

Hi there, the POCT program I manage uses Epic and Enter/Edit in Ambulatory for non-interfaced tests as well.  This is how our result field is set up.  Also, I had our Epic report writers build a weekly report that pulls all Resulted POCT, and all Unresulted POCT (ordered but not resulted) to reconcile the manual test result logs from the offices to ensure all POCT is ordered, resulted and correct.  This is the CLIA required audit mechanism for supervisory review of manually resulted POCT.  
Attachment.
image.png

Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Anastasia Augustine
almost 3 years ago
2
Replies
1
Likes
8
Followers
651
Views
Liked By:
Suggested Posts
TopicRepliesLikesViewsParticipantsLast Reply
Requirements for staff performing training
McKenna Chandler
1 day ago
20261
Michael Bishop
about 21 hours ago
Proper Way to Train
Jo Win
3 days ago
60493
Kim Ballister
1 day ago
switching POC glucose from Roche Inform II to Nova Stat Strip
Rosemary Gray
4 days ago
91510
Audrey Fulcher
2 days ago