I'm hoping some of you would be willing to share how to handle new lots of QC material. Are you performing QC every shipment, every lot number change, etc.? Specifically referring to assayed control material.
We QC new lot of cartridges/test cards so I'm specifically referring to QC material only.  

Thank you in advance!

3 Replies

For new lot numbers of Quality control material, we run it on the instrument first to ensure the new lot results appropriately prior to releasing for use.  We document this in RALS as all of our instruments are interfaced.

WE run the new lot of QC material and check if the values  we got  are within their acceptable ranges listed on their Value Assigned  list. . We like the values we get on the new lot of QC to be  close to the mean. For i-STAT,  I run at least 5 data points to calculate the mean.  
For other analyzers where the tests  are not so expensive,  we run at least 10-20. 

Thank you Stephanie and Pet!

Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Marisa Waibel
almost 5 years ago
3
Replies
1
Likes
5
Followers
557
Views
Liked By:
Suggested Posts
TopicRepliesLikesViewsParticipantsLast Reply
Investigation for CAP Survey
Danni Zheng
about 14 hours ago
00103
Danni Zheng
about 14 hours ago
IDNOW and only influenza A reported
Tracy Learned
1 day ago
61253
Tracy Learned
about 18 hours ago
GEM IQM3 pO2
Erin Adkins
9 days ago
30300
Alexandra Adams
9 days ago